Click the links below for informatoin on the area required.
Guidelines for Towage and Limitations of Nominated Berths on the River Test
Notes to Guidelines:
- These Guidelines shall be applied when using tugs with a minimum bollard pull of 4 tons per tug. If tugs of less than 4 tons are being considered the Liaison Pilot must be consulted prior to ordering.
- In reasonable weather and tidal conditions, the number of tugs used will be as specified in the listing below.
- The guidelines listed below may be altered when unfavourable weather and/or tidal conditions exist, or the efficiency of the ship's equipment or her manoeuvring capabilities are in doubt. In these cases additional tugs may be used at the discretion of the Master and Pilot or Harbour Master.
- Bow and stern thrusters, which are in good working order and producing their designed power output, may each be considered as equivalent to one tug.
Extra River Itchen Notes to Guidelines
a) A minimum of 0.5m clearance must be allowed for passing under the Itchen Bridge. Agents handling vessels bound for berths above the Itchen Bridge are requested to ensure that they confirm an accurate air draught from the Master prior to arrival in the Port. The Duty VTS Officer should be consulted if doubt exists.
b) All commercial traffic requires a minimum under keel clearance (UKC) of 0.3m and on an ebb tide 0.5m.
c) Transits of the River Itchen should not be undertaken if the visibility is less than 1 mile.
d) When wind speeds exceed 20 knots, transits of River Itchen and associated towage will be at Pilot/Liaison Pilots’ discretion.
|